1. BLAZE US Knowledge Center
  2. BLAZE Grow (Operations)
  3. Processing and Creating Packages from Harvest

Grow | Flowering Plants

Lowering is the third part of the growing process. Plantings can be viewed or edited in this section.

Viewing Planting/Batch Details

To view the planting's specific information, hover over the desired planting/batch. The following information will be displayed:

  • Batch: Internal BLAZE identifier for the group of plants in the planting/batch
  • Strain: The strain that is used for the planting/batch
  • Group: Optional, can be used across multiple plantings for common actions (+ = add group)
  • Plants: The number of plants in the planting/batch
  • Days Remaining: Based on the pot size and the flowering strain
  • Cultivation area: The cultivation area that the planting/batch is planted in
  • Zone: The zone that the planting/batch is planted in
  • Sub Zone: The subzone that the planting/batch is planted in
  • State License: The state license that is applied to the planting/batch
  • Total Age: Based on the plant's birthdate and the current date

Editing a Planting/Batch

To edit a planting, click the small 3 dots. The following options will appear:

  • Move to Harvest: This moves the planting to the next stage in the growing process
  • Split Plants
    • Enter the quantity to split
    • Enter the Metrc tag, if applicable
    • Click the Split Plant button
  • Change Location
    • Select the Cultivation Area
    • Select the Zone
    • Select the Sub Zone
    • Enter the Metrc tag, if applicable
    • Click the green Change Location button
  • Add Note
    • Click the green + Add Note button
    • Enter Notes
    • Click the green Save Note button
  • Add Image
    • Click the green + Add Image button
    • Enter image by either clicking the grey box or dragging the image into the grey box
    • Click the green Upload Image button
  • View Plants: This will redirect you to view each individual plant and further actions such as moving plantssplitting plantsapplying additivesprinting labels can be taken.
  • QA Lab Results: 
    • Select the applicable Lab
    • Click the grey + Add Record
      • Select the Testing Type
      • Enter the Amount 
    • Enter the Date
    • Add any Notes
    • Click the green Save Test Results button
  • History: This logs any changes made to the planting/batch
    • New value: The change that was made
    • User: The user that implemented the change
    • Date / Time: The date and time the change was made

 

To read about the next stage in the growing process, Harvest, click here